Skip to content
Smith Lino Moreno
Back to case studies

Asset reliability with SAP PM and Power BI

Industrial maintenance, AGROKASA S.A.

From loose SAP exports to a monthly system of maintenance indicators.

Problem

Management could not see annual plan compliance, MTBF, MTTR or backlog per asset, and work-order logging in SAP PM was inconsistent.

Process

  1. 01Validated work-order times, consumption and technical closures, and trained technicians.
  2. 02Data model with SAP PM notifications, orders and confirmations.
  3. 03Reliability indicators and a failure Pareto to prioritize critical assets.
  4. 04Criticality matrix and updated preventive and predictive plans.
  5. 05Budget control and a monthly executive report.

Results

Five maintenance types tracked every month, deviations caught in time and interventions prioritized by criticality.

54Units read per shift

Condition monitoring of condensing units

Industrial refrigeration, AGROKASA S.A.

Shift readings turned into control charts with limits.

Read full case

Ready to make better decisions with your data?

Book a free 30-minute consultation and get an initial assessment of your situation.